1990
The bottom carpark was constructed. Also, the “Go A Million Camp” was held where 699 people (from 17 groups) attended.
The bottom carpark was constructed. Also, the “Go A Million Camp” was held where 699 people (from 17 groups) attended.
The crate stacking activity was first set up. Central heating was installed into the gatehouse.
Gate house reconstructed, with kitchen and troop room, stairs and upstairs wardens room.
In July, the hall was demolished.
Camper toilet block was built at a cost of £4000. Second generator was also installed.
St Thomas Church bought for £10. Refurbished with new roof.
The old toilet block was converted into the rifle range.