1969
First generator installed – Lister 1.5 KVA.
First generator installed – Lister 1.5 KVA.
Mains electricity was connected to the site. The gatehouse was also erected.
Camper toilet block was built at a cost of £4000. Second generator was also installed.
The cabin kitchen was refurbished. Central heating was installed into the cabin.
75 years of cub scouting celebration – the big trees on the main field were planted. Later in the year was the Willesley 40th anniversary camp – visited by Garth Morrison Chief Scout.
The new toilet block in the courtyard was built.
This was the first district camp at the site. Each group had to clear their own camping plot.